Subcontract and distribution of process responsibilities

QUAQUERO, EMANUELA
2010-01-01

Abstract

The introduction, in Italy, of new regulations concerning the carrying out of works in the public works field, has given the building contractors the possibility to use of several subcontractors‘ help. In such a situation, the safety planning during the carrying out of works is a complex activity that requires redefinition and control activities that have to be constantly revised. With this object in view the new safety regulations delegate many responsibilities and fulfilments to the top management of the direct building contractors. The public administration is in charge of controlling and checking these documents. In the present survey, the suggested model shows a way to deal with the contents, and a way to play an active role in the safety management.
2010
IABSE (International Association for Bridge and Structural Engineering) Symposium Venice 2010 - Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas
978-3-85748-122-2
896
903
8
IABSE Conference 2010 - Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas
contributo
Esperti anonimi
22-24 Settembre 2010
Venezia
internazionale
Safety and Health at work; Project Management; Knowledge Management
4 Contributo in Atti di Convegno (Proceeding)::4.1 Contributo in Atti di convegno
Argiolas, C; Melis, F; Quaquero, Emanuela
273
3
4.1 Contributo in Atti di convegno
none
info:eu-repo/semantics/conferenceObject
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Questionario e social

Condividi su:
Impostazioni cookie