Construction Stage Analysis for a New Mixed Structure Building in Milan

Zucca, M.;
2018-01-01

Abstract

In this study the Construction Stage Analysis (CSA) of a new mixed structure building is discussed in order to identify the best timing and execution activities scheduling. The building is part of a new university campus that will be realized close to the center of the city. The CSA is carried out by the implementation of two models: the finite element model for the structural analyses and the BIM model for controlling the sequence of the construction phases. Once fixed the structural model, in the preliminary design phase, different sequences are analyzed in order to optimize the construction management in terms of timing and costs. Moreover, the optimization of the construction phases is set by considering the creep and shrinkage of the concrete material.
2018
2018
Inglese
2
1
66
72
7
Esperti anonimi
internazionale
scientifica
BIM; construction management; structural analysis
no
Zucca, M.; Longarini, N.; de Socio, F.; Migliori, I.
1.1 Articolo in rivista
info:eu-repo/semantics/article
1 Contributo su Rivista::1.1 Articolo in rivista
262
4
open
File in questo prodotto:
File Dimensione Formato  
Zucca_et_al_CSA_2018.pdf

accesso aperto

Tipologia: versione editoriale
Dimensione 865.56 kB
Formato Adobe PDF
865.56 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Questionario e social

Condividi su:
Impostazioni cookie