Operationalizing the experience factory for effort estimation in agile processes

Lunesu I.
2017-01-01

Abstract

[Background] The effort required to systematically collect historical data is not always allocable in agile processes and historical data management is usually delegated to the developers' experience, who need to remember previous project details. However, even if well trained, developers cannot precisely remember a huge number of details, resulting in wrong decisions being made during the development process. [Aims] The goal of this paper is to operationalize the Experience Factory in an agile way, i.e., defining a strategy for collecting historical project data using an agile approach. [Method] We provide a mechanism for understanding whether a measure must be collected or not, based on the Return on Invested Time (ROIT). In order to validate this approach, we instantiated the factory with an exploratory case study, comparing four projects that did not use our approach with one project that used it after 12 weeks out of 37 and two projects that used it from the beginning. [Results] The proposed approach helps developers to constantly improve their estimation accuracy with a very positive ROIT of the collected measure. [Conclusions] From this first experience, we can conclude that the Experience Factory can be applied effectively to agile processes, supporting developers in improving their performance and reducing potential decision mistakes.
2017
9781450348041
Agile software development; Experience factory; Knowledge management
Files in This Item:
File Size Format  
3084226.3084240.pdf

Solo gestori archivio

Type: versione post-print
Size 468.58 kB
Format Adobe PDF
468.58 kB Adobe PDF & nbsp; View / Open   Request a copy

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Questionnaire and social

Share on:
Impostazioni cookie