Bonifica del sito FAS di Cagliari

LALLAI, ANTONIO;MANCA, PIER PAOLO
2009-01-01

Abstract

The paper describes the characterisation of a complex contaminated site where an EAF still mill operated for 32 years. In addition, the site remediation project is illustrated. The approach was to treat the contaminated materials and wastes to recover the greatest amount of inert materials to use in situ.
2009
91
1
98
103
6
Sì, ma tipo non specificato
2008
Lallai, Antonio; Manca, PIER PAOLO
1.1 Articolo in rivista
info:eu-repo/semantics/article
1 Contributo su Rivista::1.1 Articolo in rivista
262
2
none
Files in This Item:
There are no files associated with this item.

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Questionnaire and social

Share on:
Impostazioni cookie