BIM based workflow for 4D construction planning
Rubiu, Giulia
First
Conceptualization
;Quaquero, EmanuelaSecond
Supervision
;Desogus, GiuseppePenultimate
Member of the Collaboration Group
;Stocchino, GiovannaLast
Writing - Original Draft Preparation
2022-01-01
Abstract
The studies conducted on Building Information Modeling methodology and its associated tools spotlight the related great improvement in managing the construction phase. This paper shows how BIM4D simulation can boost the accuracy of the temporal and economic forecast of the constructive intervention. This approach can reduce problems related to the incorrect interpretation of the work program because it is able to directly relate the information model with the work program in a single environment. Moreover, this contribution reports the strong improvement in the construction phase management by the integration of BIM 4D methods and tools and a geospatial 3D mapping platform.File | Size | Format | |
---|---|---|---|
2022_EC3_ID196_Camera_Ready_Paper.pdf Solo gestori archivio
Type: versione editoriale
Size 378.37 kB
Format Adobe PDF
|
378.37 kB | Adobe PDF | & nbsp; View / Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.